Monday nights (10pm-6am) is a notoriously slow shift at jack. We were projected to do something like 400$ in sales.
We did $322.00 in sales. In one hour. With three people on shift. We were up all night in sales based on the projected hourly by at least 30$. Supposed to do 92$ in sales from 2a-3a? We did 140.
The store was 150$ in the hole when I came on at ten. It was 350$ over when I left at 6.
Oh and last night was the first night a kid from days worked a grave shift. He'd been trained on the register for about an hour overall before getting hit with that last night. Granted, I was on till for the 322 hour, but we were still slammed after that. Poor kid.
We did $322.00 in sales. In one hour. With three people on shift. We were up all night in sales based on the projected hourly by at least 30$. Supposed to do 92$ in sales from 2a-3a? We did 140.
The store was 150$ in the hole when I came on at ten. It was 350$ over when I left at 6.
Oh and last night was the first night a kid from days worked a grave shift. He'd been trained on the register for about an hour overall before getting hit with that last night. Granted, I was on till for the 322 hour, but we were still slammed after that. Poor kid.
Comment